Huge crane hoists 90-tonne steel bridge into place on £47m bypass
The 42-metre long crossing was lifted into place - on top of specially constructed concrete abutments either side of the new road - using a 750-tonne crane.
Fabricated in Kent, the 90-tonne footbridge had to be delivered in two sections before it was welded together.
The bridge was delivered in two sections (Image: Drone Vision Norfolk)
Once complete and........
© Norwich Evening News
