menu_open Columnists
We use cookies to provide some features and experiences in QOSHE

More information  .  Close

Huge crane hoists 90-tonne steel bridge into place on £47m bypass

7 1
previous day

The 42-metre long crossing was lifted into place - on top of specially constructed concrete abutments either side of the new road - using a 750-tonne crane.

Fabricated in Kent, the 90-tonne footbridge had to be delivered in two sections before it was welded together.

The bridge was delivered in two sections (Image: Drone Vision Norfolk)

Once complete and........

© Norwich Evening News