Scheme to slow coastal erosion and protect village enters stage three
In Trimingham, drainage work is being carried out to reduce water saturation in the cliffs, which contributes to erosion.
A new video update released by North Norfolk District Council features interviews with project partners and explains the drainage scheme in detail.
The scheme involves digging a trench and installing a perforated pipe beneath the surface, which is then covered with soil and aggregate to prevent blockages.
Rainwater filters through the soil and aggregate into the pipe,........
