menu_open Columnists
We use cookies to provide some features and experiences in QOSHE

More information  .  Close

Why the net zero transition is not about building more wind turbines

41 0
11.02.2026

The UK is electrifying faster than it is building the infrastructure to support it. The transition won’t fail because we can’t generate enough power, but because the grid isn’t stable enough to deliver it. says Emma Parkinson

The EV charger story is being treated like a consumer inconvenience – a queueing problem, a pricing problem, a reliability problem. It’s none of those first. It’s an infrastructure and grid stability problem dressed up as a charging debate.

It was reported that this week that the UK has nearly 88,000 charge points, while government estimates suggest we may need 250,000 to 550,000 by 2030. Even the lower end implies a sustained build rate far above what we’ve normalised as “progress”. And it’s not just the number of chargers. A rapid-charging network is a set of high-power loads that arrive in clusters, at peaks and often in precisely the places where the network is weakest. If the grid cannot carry the load, the charger is just a tokenistic screen.

Grid stability is the difference between “renewables are cheap” as a slogan and “renewables can run an economy” as a fact

This is where the UK’s natural wind and tidal potential becomes a dangerous distraction. Yes, the resource is there. But resource is not the same as deliverable power at the right time, in the right place, at the right quality. The transition fails not when you can’t generate enough electricity over a year, but when the system can’t keep frequency and voltage within tolerance on a wet Tuesday evening when demand spikes, wind falls away, and constraints prevent power moving from one region to another. Grid stability is the difference between “renewables are cheap” as a slogan and “renewables can run an economy” as a fact.

Free Thinking - City AM Opinion Newsletter

Get weekly sparky insight and expert commentary on markets, entrepreneurship and innovation from City AM’s Opinion Editor, delivered every Saturday.

Grid stability is already costing billions – and that cost is political

The UK has already crossed the symbolic threshold: renewables produced just over half of UK electricity generation in 2024, with wind taking a record share. This should be a victory lap. Instead, the bill for keeping the system........

© City A.M.