COMMENTARY: The true cost of diesel power to Prince Edward Island
Share this Story : PNI Atlantic News Copy Link Email X Reddit Pinterest LinkedIn Tumblr
COMMENTARY: The true cost of diesel power to Prince Edward Island
Energy planning in P.E.I. should be just that, planning – done with the future in mind. Right now, it seems that Maritime Electric isn’t interested in planning. They’re interested in ramming through $353 million for a 100 MW ProEnergy fossil-fuel generation project, using refurbished turbines converted from aircraft engines.
Subscribe now to access this story and more:
Unlimited access to the website and app
Exclusive access to premium content, newsletters and podcasts
Full access to the e-Edition app, an electronic replica of the print edition that you can share, download and comment on
Enjoy insights and behind-the-scenes analysis from our award-winning journalists
Support local journalists and the next generation of journalists
Subscribe or sign in to your account to continue your reading experience.
Unlimited access to the website and app
Exclusive access to premium content, newsletters and podcasts
Full access to the e-Edition app, an electronic replica of the print edition that you can share, download and comment on
Enjoy insights and behind-the-scenes analysis from our award-winning journalists
Support local journalists and the next generation of journalists
Create an account or sign in to continue your reading experience.
Access additional stories every month
Share your thoughts and join the conversation in our commenting community
Get email updates from your favourite authors
Sign In or Create an Account
This combustion turbine project is reactionary, expensive, pollution-heavy and has a 50-year lifespan. Ratepayers deserve a solution that is properly tested, responsibly designed and aligned with long-term affordability and provincial emissions targets.
Affordability matters. Islander ratepayers ultimately bear the cost of utility investments through........
